| 改水电改造施工 |
| 添加时间:2019/8/17 14:42:21 浏览次数: |
| 改造施工 Reconstruction Construction 施工单位 Construction unit 还是那句俗话,磨刀不误砍柴时,做好完善的水电改造方案,是保证施工顺利进行重要条件,同时确保装修方案的完整、科学、安全可靠。 It is also the saying that when cutting firewood properly with a sharpened knife, it is an important condition for the smooth construction and the complete, scientific, safe and reliable decoration plan. 对业主来说,水电改造开工前具备:1、水电改造设计方案成熟,完整方案应该包括准确的水路电路定位点。2.签定水电改造安装合同。3.必要的临时用电用水环境。 For the owners, before the start of the hydropower transformation, there are: 1. The design scheme of the hydropower transformation is mature, and the complete scheme should include accurate positioning points of the waterway circuit. 2. Sign a contract for hydropower renovation and installation. 3. Necessary temporary electricity and water environment. 对施工单位要求:1.详细可行的水电路走向设计图纸 2.临时施工用电设备安全可靠 3.其他日常准备工作完毕。 Requirements for construction units: 1. Detailed and feasible design drawings for the direction of hydropower circuits 2. Safety and reliability of electrical equipment for temporary construction 3. Completion of other routine preparations. 施工程序 Construction procedure 施工人员对照设计图纸与业主确定定位点→施工现场成品保护→根据线路走向弹线→根据弹线走向开槽→开线盒→清理渣土→电管、线盒固定→穿钢丝拉线→连接各种强弱电线线头,不可裸露在外→封闭电槽→对强弱电进行验收测试(最后一条属验收项目,详情见下一篇) Contrast the design drawings with the owner to determine the locating points the protection of finished products on the construction site the elastic line along the line grooving opening box cleaning the dregs and soil fixing the tube and box piercing the wire connecting all kinds of strong and weak wire ends, and not exposed enclosed cell testing the strong and weak electricity. Receive the test (the last item belongs to the acceptance project, see the next article for details) |
| 上一页 插座安装工艺要求 |
| 下一页 水电意义 |
Copyright © 技术支持:遨游网络