返回首页

保定专业水电改造施工

本站导航

新闻动态

当前位置:网站首页 > 新闻动态 > 详细信息
雄安新区的能源关键词,天然气、地热能是重点
添加时间:2018/1/30 17:33:49     浏览次数:
昨晚,一则重磅消息出街:中共中央、国务院印发通知,决定设立河北雄安新区。
Last night, a heavy news story emerged: the central committee of the communist party of China (CPC) and the state council issued a notice to establish a new area of hebei province.

 

 
在新华社的报道中,雄安新区规划范围涉及河北省雄县、容城、安新3县及周边部分区域,地处北京、天津、保定腹地,是继深圳经济特区和上海浦东新区之后又一具有全国意义的新区,是千年大计、国家大事。
In the xinhua report, the male Ann district planning covers xiong county, hebei province, city, AnXin 3 and the surrounding area of the county, located in the hinterland of Beijing, tianjin and baoding, is following the shenzhen special economic zone and pudong new area in Shanghai and a national significance of the new city, is one thousand years, the state affairs.

 

 
隔着屏幕,我们都能感受到这个国家级新区的与众不同。
Across the screen, we can all feel the difference between the national new district.

 

 
今年2月,国家领导专程到安新县进行实地考察,并对规划建设雄安新区提出包括建设绿色智慧新城、打造优美生态环境在内的七大重点任务。
In February this year, world leaders made a special trip to anxin for field trips, and the planning and construction of male Ann district new city, including the construction of green wisdom makes the beautiful ecological environment, the seven key tasks.

 

 
不到200字的任务清单中,“绿”字出现了4次。
In less than 200 words, the word "green" appears four times.

 

 
要想富,先修路,要想绿,能源选择是关键。参考北京,北京已经成为全国首个全部实施清洁能源发电的城市。可以想见,这个待高标准开发的新区,在能源布局上也将与清洁能源紧密联系。
If you want to be rich, you have to build the road. If you want to be green, energy selection is the key. Beijing has become the first city in the country to use clean energy. It is conceivable that the new zone, which will be developed with high standards, will also be closely related to clean energy in the energy distribution.

 

 
eo根据河北省、保定市等相关规划,梳理出与雄安新区相关的能源关键词。
Eo according to hebei province, baoding city and other related planning, comb out the energy keywords related to xiong 'an new area.

 

 

 
天然气
Natural gas

 
“县县通气”工程
"County ventilation" project

 
根据河北省天然气发展“十三五”规划,河北将确保禁煤区保定、廊坊市2017年10月底前完成除电煤、集中供热和原料用煤外燃煤“清零”工程,实现保定“县县通气”覆盖率100%。
According to the natural gas development "much starker choices-and graver consequences-in planning in hebei province, hebei will ensure that the forbidden coal district, baoding, langfang finished before the end of October 2017, in addition to coal, central heating, and raw material coal coal" reset "project, realize the baoding" county county ventilation "coverage of 100%.

 

 
保定市天然气管道工程
Baoding natural gas pipeline project

 
保定在河北天然气管道版图中占据重要位置:蒙西煤制气管道、京邯复线途径保定地区,境内长度578公里,初步形成以陕京一线、京邯线、京邯复线、保霸线、蒙西煤制气管线为主干,以接至各县管线为分支的网络架构。河北省天然气发展“十三五”规划表示,2020年将完成涞源、阜平支线,实现“县县通气”目标。
Occupy the important position in baoding in hebei natural gas pipeline map: stake of coal gas pipeline, the double track way to baoding area, 578 kilometers in length, initially formed to the shanxi-beijing a double line, the line, the line, Beijing Beijing bully line, give priority to dry coal gas pipeline in stake, to connect to various counties pipeline for branch network architecture. According to the 13th five-year plan for natural gas development in hebei province, we will complete the laiyuan and fuping branch line in 2020 to achieve the goal of "county ventilation".

 

 
天然气调峰项目
Natural gas peak project

 
在天然气日调峰项目上,保定市液化天然气应急调峰储备中心(徐水)将新增储气能力1万立方米,配套建设输气管线39公里,建设分输站和接收门站;保定市燃气(LNG、LPG)战略储备库(定兴)工程也将建设液化石油气储罐(5000立方米)8个,液化天然气储罐(20000立方米)2个,新增储气总量8万立方米。
In natural gas peak shaving, liquefied natural gas (LNG) emergency peak-shaving reserve center of baoding city (Xu Shui) will the new basis of capacity of 10000 cubic meters of gas, 39 kilometers, supporting the construction of gas pipeline construction distribution station and receive door station; Baoding city gas, LNG, LPG) strategic stockpile (DingXing) construction will also be liquefied petroleum gas storage tank (5000 cubic meters) 8, liquefied natural gas storage tank (20000 cubic meters) 2, the new basis of gas volume of 80000 cubic meters.

 

 
京邯复线工程
The jing han restoration project

 
京邯复线工程包括京石邯输气管线复线干线和高清线联络线,已于2015年9月列入河北省“十三五”天然气规划,途径涿州市、涞水县、高碑店市、定兴县、徐水县、容城县、清苑县、望都县等4个设区市的18个县(市)。沿线共设置17座站场和12座阀室。该管线工程气源来自中石化拟建的鄂安沧管道,中远期气源为中海油蒙西煤制气及俄气等。
Beijing han multiple tracks including China gas transmission pipeline double track lines and hd line link, in September 2015 on "much starker choices-and graver consequences-in planning of natural gas in hebei province, zhuozhou, laishui county, gao beidian, dingxing county, xushui county, city, bao, wangdu county four city divided into districts of the 18 counties (cities). There are 17 stations and 12 valve rooms along the route. The pipeline project is derived from sinopec's proposed uangcang pipeline, which provides gas and gas for cnooc mengxi coal.

 

 
地热能
Geothermal energy,

 
在河北省地热开发利用“十三五”规划中,地热资源优势突出的保定市所规划的地热面积最大。规划表示,到2020年末,保定市将新建水热行地热供暖面积1100万平方米,完成新建和改造建筑项目浅层地热能供暖(制冷)面积265万平方米。
In hebei province geothermal development and utilization of the "13th five-year plan" plan, the geothermal resources advantage outstanding baoding city planning the largest geothermal area. Planning, said at the end of 2020, baoding will new hot line of geothermal water heating area of 11 million square meters, complete renovation and new construction of shallow geothermal energy heating (cooling) area of 2.65 million square meters.

 

 
其中,在地热供暖示范工程中,规划表示将“以保定地区东部地热重点开发带为核心,重点开发雄县—容城—安新—博野—蠡县—安国等地地热资源”。
Among them, in the geothermal heating demonstration project, the program says it will "in the eastern part of the baoding area geothermal key development zones as the core, the key development xiong county - round city - AnXin - bo have wild - at lixian county after - sale and geothermal resources".

 

 
生物质能
Biomass energy

 
河北省可再生能源发展十三五规划表示,将在保定、沧州、石家庄、邢台地区黑龙港流域粮食主产区……发展多元化生物质能利用方式,重点推进规模化大型沼气工程建设和规模化生物天然气试点工程建设。其中,保定生物质发电规划达2万千瓦、垃圾发电达3.6万千瓦,农村户用沼气达0.2亿立方米、大中型沼气达0.4亿立方米、生物天然气达0.5亿立方米。
The 13th five-year plan for renewable energy in hebei province will be announced in baoding, cangzhou, shijiazhuang, xingtai area of the main areas of the black dragon basin... We will develop diversified biomass energy utilization methods, and focus on the construction of large-scale biogas projects and pilot projects for large-scale bio-natural gas. Among them, baoding biomass power generation planning of 20000 kilowatts, garbage power of 36000 kw, the rural household biogas 020 million cubic meters, large and medium-sized methane 040 million cubic meters, biological gas 050 million cubic meters.

 

 
太阳能
Solar energy

 
保定市2020年太阳能集热累计面积规划达到221万平米,占全省开发区域的1/8。
The total area of solar heat accumulation in baoding city in 2020 reaches 1.221 million square meters, accounting for 1/8 of the development area of the province.

 

 
风能
wind

 
鼓励秦皇岛、保定、衡水、沧州等地区开展低风速风电开发建设。到2020年,装机容量达到200万千瓦。
We will encourage the development and construction of low-wind wind power in qinhuangdao, baoding, hengshui, cangzhou and other regions. By 2020, the installed capacity will reach 2 gw.

 

 
抽水蓄能
Pumped storage

 
加快开展易县120万千瓦、抚宁120万千瓦抽水蓄能电站前期工作,确保在“十三五”期间核准并开工建设。
We will accelerate the work of 1.2 million kw and 1.2 gw of pumped storage power stations in yixian, and ensure that construction will be approved during the 13th five-year plan period.

 

 
电网
The grid

 
特高压变电站
Ultra high voltage substation

 
2016年12月,蒙西—天津南1000千伏特高压交流输变电工程投入商业运行,位于河北保定定兴县的1000千伏特高压变电站顺利投运。河北省可因此每年接受省外电力约150亿千瓦时。
In December 2016, mengxi -- tianjin nan-1000 kv high-voltage exchange transmission and transformation project was put into commercial operation, and the 1000-volt high-voltage substation in baoding, hebei province was successfully transported. Hebei province can thus receive about 15 billion kilowatt-hours of electricity every year.

 

 
15项重要电网建设项目
15 major power grid projects

 
2017年2月24日,保定市政府领导作出批示,明确保定市各县(市、区)政府将220千伏雄州东输变电工程、市区110千伏西大园输变电工程等15项重要电网建设项目纳入政府重点工作。这15项工程计划8项年内投产、7项年内开工。
On February 24, 2017, baoding government leadership instructions, various counties (city, area) of baoding city government will clearly male state of 220 kv power transmission and transformation project, the city east 15 110 kv power transmission and transformation of west garden engineering important power grid construction projects into government priority. The 15 projects are scheduled to go into production in eight years and start in seven years.

 

 
河北省电力官网信息表示,项目建成后,必将对提高保定电网尤其是城区电网供电能力具有重要意义。
After the project is completed, it will be of great significance to improve the power supply capacity of baoding power grid, especially the urban power grid, according to the official website of hebei provincial power website.
上一页  地暖改造的三大要点  
下一页  地暖改造的三大要点
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3