水电改造注意事项
水电改造注意事项
Precautions for hydropower transformation
根据方案图纸进行的水电改造施工完毕,立即进行水电改造工程验收。具体说,电路改造强电线头连接完毕,弱电线布线到位,水暖管道的铺设完成即可启动验收程序。杜绝以据经验施工,施工完毕不做验收,装修工程完成后如果出现问题很难弥补损失。
Upon completion of the hydropower transformation construction according to the plan drawings, the hydropower transformation project shall be accepted immediately. Specifically, the acceptance procedure can be started after the strong wire head is connected, the weak wire is wired in place, and the plumbing pipe is laid. No construction based on experience, no acceptance after construction, and it is difficult to make up for the loss if there is any problem after the completion of the decoration project.